Quick Job Application

In a rush? Simply drop off your CV by clicking on the button to your right, and we'll get in contact if we have a suitable vacancy.

First Recruitment Group Awarded Contract for Trans-Adriatic Pipeline Project

30 Nov 2015

After winning the contract to recruit skilled professionals for the Trans-Adriatic Pipeline (TAP) Project though tender process back in September, we have been busy working to fill the roles with great success, already placing contractors in Albania.

We have recently opened an office in Albania, First Technical Albania Shpk, to best serve both our clients as well as the contractors being placed in-country, helping with work / resident permits and mobilisation. We have over 18 years working in the Oil & Gas industry on an international scale, and this is the next step in the exciting expansion of our global foot print.

Our dedicated Oil & Gas division is therefore looking for skilled professionals for the roles below to mobilise as soon as possible.

  • Quality Managers – Italy, Albania & Greece
  • Health & Safety Managers and Advisors – Albania & Greece
  • Site Representatives – Italy & Albania
  • Project Engineers – Greece & Albania
  • Occupational Health Specialists – Greece
  • Cost Engineers – Greece
  • Document Controllers – Greece
  • Contracts Administrator – Italy
  • Risk Engineers - Italy, Albania & Greece
  • AUT Specialists, Site based Inspectors and Engineers will also be required early 2016

The Trans Adriatic Pipeline will transport Caspian natural gas from the giant Shah Deniz II field to Europe. This project will open the so-called Southern Gas Corridor, enhancing Europe’s energy security by contributing to the diversification of the gas supplies.

The construction of the pipeline, and its related facilities, is taking place in stages, with the actual intense construction along the pipeline Right-of-Way taking place over a period of 3 to 6 months. However, overall access to land will be required for a longer period, and could actually last between 12 and 24 months, inclusive of the intense construction periods. Once built, the onshore pipeline will be buried at least one metre beneath the ground and therefore not visible for the entire route.

Click on the links below to find out about some of our live roles:

If you are interested in finding out more about any of these roles please call us on +44 (0) 1925 907000 or email david.dixon@firstrg.com

LinkedIn

If you are a pipeline professional and would like to keep up to date on the latest news and jobs join our dedicated Pipeline Professionals Network on LinkedIn

Help someone you know take the next step in their career with First Recruitment Group.

Refer a Friend

Testimonials

Help us with our survey
Do you feel the jobs market has picked up?